A prompt buyers ask AI

How do BIM platforms handle ISO 19650 information states and approval gates, and which ones make the WIP to Shared to Published workflow easiest to run?

Measured in 1 answer, last on Nov 19, 2026. Only the passages that name a brand are shown.

Brands in the answers

BrandNamed inRecommended inPositiveAvg. position
Dalux100%100%100%—
Autodesk Construction Cloud100%100%100%—
Bentley ProjectWise100%100%100%—
Asite100%100%100%—
Trimble Connect100%0%0%—

Where each answer names a brand

Answer 1 · Nov 19, 2026 · 10 sources cited
DaluxRecommendedSite citedpositive
“My recommendation: If your priority is making the WIP → Shared → Published workflow straightforward to operate, start by comparing Autodesk Construction Cloud, Asite, Bentley ProjectWise and Dalux.”
+ Separation of information states

“Clear separation of information states.”

+ Intuitiveness for project teams

“Relatively intuitive for project teams.”

+ Explicit approval processes

“Approval and authorisation processes are explicit.”

+ BIM model and drawing integration

“Good BIM model and drawing integration.”

+ Construction-site usability

“Strong construction-site usability.”

− Enterprise document management

“Less suitable for extremely complex enterprise document-management environments than some specialist platforms.”

− Edition-dependent workflows

“Advanced workflows depend on the product edition.”

− Client-specific governance configuration

“Complex client-specific governance may require careful configuration.”

Trimble ConnectSite citedmixed
“Trimble Connect | Good | Good | Depends on configuration | Good”
+ BIM collaboration

“Good BIM collaboration.”

+ Model-based coordination

“Useful model-based coordination.”

+ Configurable document review

“Configurable document review.”

+ Trimble ecosystem integration

“Good integration with the wider Trimble ecosystem.”

− ISO 19650 configuration

“ISO 19650 implementation requires more attention to configuration.”

− Document workflow assessment

“Its document workflow should be assessed separately from its BIM collaboration capabilities.”

− Formal information-state management

“Less immediately compelling than Dalux or Asite if formal ISO 19650 information-state management is the main selection criterion.”

Autodesk Construction CloudRecommendedpositive
“My recommendation: If your priority is making the WIP → Shared → Published workflow straightforward to operate, start by comparing Autodesk Construction Cloud, Asite, Bentley ProjectWise and Dalux.”
+ Revit integration

“Excellent integration with Revit and design coordination.”

+ Document review interface

“Familiar document review interface.”

+ Balance of document control and BIM collaboration

“Good balance between document control and BIM collaboration.”

+ Project templates

“Project templates help standardise CDE configurations.”

+ Review visibility

“Good visibility of reviews and outstanding approvals.”

− Configuration requirements

“The ISO 19650 structure needs to be configured correctly.”

− Permission administration

“Folder permissions and workflow permissions require careful administration.”

− Complex approval processes

“Complex enterprise approval processes can become cumbersome.”

− Feature variability across modules

“Some functionality varies between Autodesk Docs and other ACC modules.”

Bentley ProjectWiseRecommendedpositive
“My recommendation: If your priority is making the WIP → Shared → Published workflow straightforward to operate, start by comparing Autodesk Construction Cloud, Asite, Bentley ProjectWise and Dalux.”
+ Workflow configurability

“Highly configurable workflows.”

+ Access control

“Sophisticated access control.”

+ Revision and document management

“Strong revision and document management.”

+ Large engineering organisations

“Excellent for large engineering organisations.”

+ Infrastructure and engineering suitability

“Particularly suitable for infrastructure and multidisciplinary engineering.”

− Administration overhead

“More administration and configuration.”

− Learning curve

“Steeper learning curve.”

− Complexity for smaller projects

“Can be unnecessarily complex for smaller building projects.”

AsiteRecommendedSite citedpositive
“My recommendation: If your priority is making the WIP → Shared → Published workflow straightforward to operate, start by comparing Autodesk Construction Cloud, Asite, Bentley ProjectWise and Dalux.”
+ Information governance

“Strong information governance.”

+ Complex approval chains

“Good control of complex approval chains.”

+ Multidisciplinary projects

“Well suited to multidisciplinary and multi-company projects.”

+ Document control and auditability

“Strong document control and auditability.”

+ Large programmes and portfolios

“Particularly interesting for large programmes and portfolios.”

− Initial configuration

“Requires initial configuration and process definition.”

− Implementation effort

“Can be more involved to implement than a simpler CDE.”

− Learning requirements

“Teams need to understand the underlying information-management rules.”

Sources the answers cite

← All prompts and the BIM & Architecture Collaboration ranking